Pie Progress is a circular progress chart that’s a popular choice to represent complicated information. Using this addon, any stats on your webpage can be displayed in a way that’s eye-catching and easy to understand.

pie progress addon

How to Add Pie Progress

As usual, to add a Pie Progress, open the Addons Panel from the Sidebar or by clicking on the plus icon at the center of a row. You’ll find the Pie Progress addon under the Content section so drag and drop this to your canvas.

Pie Progress Settings

Click on the Pie Progress you just added to open the settings panel and access customization options.

Progress

Percent: This is the most important option. Percent represents how much of the Pie Progress will be filled up and is basically the progress or data that you want to show.

Font Size: This option will change the size of the progress percentage text that’s at the center of the Pie Chart.

Chart Size: Use this range slider to adjust the size of the chart using this option.

Duration: Set how long the Pie Progress animation will take. This duration is in milliseconds.

Bar Width: This option is used to change the width of the circular Bar of the Pie Progress.

Drag the range slider or enter a number into the input fields to change these values.

Icon

You can also add an Icon to your Pie Progress chart. To do this, open the Pie Progress Settings and go to the Icon tab. 

Choose Icon: Click on this to open the Icon Library and select your Icon.

Size: Select the size from the dropdown list. Size options available are Standard, Tiny, Small, Medium, Large, and Extra Large.

Content

You can also add some Text to your Pie Progress which helps add more context to it. 

And the three-dot icon on the top-right gives you even more options to customize your Content like font size, alignment, list, image upload, etc.

Title

You can also add a Title to your Pie Progress. Go to the Title tab on Pie Progress Settings to access this option. 

Title: Enter the text for the Title

HTML Element: Set the HTML element hierarchy as H1, H2, H3, etc.

Top Margin: Set the top margin of your Title.

Bottom Margin: Set the bottom margin of your Title.

Typography Settings

Click on the ‘A’ Letter icon on the inline editor to open the Typography window. Here, you can adjust the Font, Font Size, Line Height, etc for the text in your Pie Progress. For detailed information on Typography check out this documentation.

Color

Change your Pie Progress’s color scheme using the Color Settings. Click on the Circle icon from the inline editor to open this window. Here, you will be able to change the color for the Bar, Progress, and Percent. Clicking on the color box will open the Color Picker window where you can easily select the color you want.